VAL-D'OR, Quebec, May 31, 2018 (GLOBE NEWSWIRE) -- Metanor Resources Inc. ("Metanor" or the “Company”)
(TSX-V:MTO) reports its financial results for the quarter ended March 31, 2018. This press release should be read in
conjunction with Metanor’s financial statements for the quarter ended March 31, 2018 and the related Management’s Discussion and
Analysis (MD&A), which can be found on the Company’s website www.metanor.ca and on SEDAR www.sedar.com. All amounts are in Canadian dollars unless stated otherwise.
KEY DEVELOPMENTS FOR THE QUARTER
- Metanor is following through with the corporate refocusing aimed at simultaneously increasing production and
exploration programs while leveraging and enhancing our existing infrastructures as Metanor has the only permitted and operating
facility in the extremely prospective Urban Barry camp. The Company continues to develop new mining areas to increase mining
tonnages in the short term.
- In conjunction with Metanor’s robust exploration programs (29,940 metres drilled during the quarter), we are
moving along with the public consultations, as part of the permitting process, to increase the daily capacity of the mill from
800 tonnes per day to 2,400 tonnes per day. This increased capacity at Bachelor would allow feed from the Barry project,
the Bachelor mine and Moroy sector. Management expects that the Moroy Sector could generate enough ore in the short term to
increase the tonnes milled per day to 800 tonnes from the current milling rate of approximately 500 tonnes per day which would
have a significant positive impact.
- The Company began the construction of a new camp at the Barry project in the quarter, which was completed in May,
to accommodate the additional workers required to proceed with the 50,000 underground bulk sample scheduled to be completed by
the Q4 in 2018.
EXPLORATION HIGHLIGHTS FOR THE QUARTER
• The Moroy Zone adds new dimension to the Bachelor Mine as development from the new drill bay at level 11,
towards the Moroy Zone (1 km south of the Bachelor Mine), continued. A second diamond drill was commissioned to define the
Moroy structures from underground and 7,409 metres were drilled in the quarter:
- The Moroy Vein System was extended by over 100 metres to depth from underground exploration drilling, which
included significant intercepts such as 7 g/t Au over 3.9 metres and 7.4 g/t Au over 2.7 metres; and
- the ongoing underground development at level 11 of the Bachelor mine reached the two known Moroy Veins, while
returning significant intercepts such as 50.9 g/t Au over 4.8 metres, and 5.6 g/t Au over 4.4 metres, and extending the
continuity of the structures in all directions.
• With two drills in use, 9,626 metres were drilled at the Barry Project, located in the Urban-Barry Camp
110 km south of the Bachelor mill, during the quarter. These drill results have established:
- The presence of a series of high grade gold sub-vertical shears below the three small pits, 1,500 metres along
strike length, and a depth exceeding 440 metres, that remains open in all directions;
- The presence of a series of gold bearing tension veins associated with the shears;
- In January, new high-grade intercepts of 14.3g/t Au over 4.6 metres and 10.4 g/t Au over 4.5 metres are made;
- In February, step out drilling extended the Main Zone at depth with intercepts 21.2 g/t Au over 1.7 metres, 31.5
g/t Au over 1.1 meters and 24.7 g/t Au over 1.5 metres;
- In March, new high-grade shear zone intercepts of 18.9 g/t Au over 1.6 metres in at the new Bart zone, located 3.5
km west of the Barry Project Deposit (These new exploration drill results are SW of the Windfall trend and are found in gold
bearing shears/veins, hosted within a Diorite/Gabbro intrusion).
- Metanor completed 12 holes for a total of 2985 metres, designed to test historical gold grades in the area from
previous operators, such as 23.8 g/t Au over 4.4 metres and 11.8 g/t Au over 6.5 metres in the Bart Zone; and the exploration
team has been able to identify and confirm gold bearing shears/veins within the mafic intrusive host.
OTHER EVENTS
• In April, the Barry Project Deposit is expanded eastward and at depth with high grade intercepts
including 15.8 g/t Au over 1.5 metres and 12.3 g/t Au over 1.3 metres, demonstrating the continuity and predictability of the Barry
shear hosted gold deposit.
• In May, intersects of 19.1 g/t Au over 3.6 metres at the Bachelor Mine down-plunge of Main Vein pursuant
to the underground drill campaign, which includes new high-grade results of 19.1 g/t Au over 3.6 metres, 12.0 g/t Au over 4.0
metres and 6.4 g/t Au over 21.8 metres. These new results have extended the deposit 183 metres or 600 feet below the lowest working
level at Bachelor Mine and demonstrate the southeasterly plunging continuity to the deposit.
FINANCIAL HIGHLIGHTS FOR THE QUARTER
- Gold production of 6,654 ounces of gold leading to gold sales of 6,764 ounces from Bachelor Mine;
- $9,533,399 in gold sales, after sales of ounces in the stream agreement, at an average realized price of $1,683
per ounce sold (US$1,331/oz using an exchange rate of US$0.791/C$1.00);
- Gross Loss of $458,878.
Pascal Hamelin, President and Chief Operating Officer states: “Our results are in
line with our rebuilding strategy. The robust increase in exploration has added a completely new dimension to the
Bachelor Mine with the Moroy Zones extending continuously from surface to depth below 600 metres and the encouraging results at
Barry lead us to believe that our strategy will pay off as we move towards significantly increase our production
profile.”
OPERATION SUMMARY
|
Three months
Ended |
Three months
Ended |
|
31-Mar-18 |
31-Mar-17 |
Operational Summary |
|
|
Development/Drilling - metres |
|
|
Underground development Bachelor |
1,362 |
1,230 |
Underground development Barry |
14 |
0 |
Total Underground development |
1,376 |
1,230 |
|
|
|
Diamond drilling Bachelor |
7,625 |
7,975 |
Diamond drilling Barry |
9,626 |
7,239 |
Diamond drilling Moroy |
7,409 |
0 |
Diamond drilling Other |
5,280 |
0 |
Total Diamond drilling |
29,940 |
15,214 |
|
|
|
Tonnes milled |
43,567 |
61,101 |
Feed grade (g/t) |
4.9 |
5.0 |
Mill recovery rate (%) |
96.4 |
96.4 |
Ounces produced |
6,654 |
9,442 |
Ounces sold |
6,764 |
10,881 |
|
|
|
Financial results |
|
|
Net sales $ (net streaming) |
9,553,399 |
16,304,364 |
average realized price $ |
1,683 |
1,498 |
average realized price US $ |
1,331 |
1,133 |
Exchange rate US to CDN $ |
0.791 |
0.76 |
Operating Costs $ |
8,220,620 |
10,474,661 |
Qualified Persons
Pascal Hamelin, P. Eng., President, is the Qualified Person under NI 43-101, responsible for reviewing and
approving the technical information contained in this news release.
Cautionary and Forward-Looking Statements
This press release includes certain statements that may be deemed "forward-looking statements, including
statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to the future business
activities and operating performance of the Company. The words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”,
“believe”, “estimate”, “expect” and similar expressions, as they relate to the Company, are intended to identify such
forward-looking statements. Investors are cautioned that forward-looking statements are based on the opinions, assumptions and
estimates of management considered reasonable at the date the statements are made, and are inherently subject to a variety of risks
and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those
projected in the forward-looking statements. These factors include, among others, the development of the Company’s properties,
expected production from, and the further potential of, the Company’s properties, the anticipated timing and commencement of
exploration programs on various targets within the Company’s land holdings, the ability of the Company to successfully achieve
business objectives, the Company's expectations in connection with the projects and exploration programs being met, the impact of
general business and economic conditions, fluctuating gold prices, currency exchange, possible variations in ore grade or
recovery rates, changes in accounting policies, changes in the Company's corporate mineral resources, changes in project
development, construction, production, the possibility of project cost overruns or unanticipated costs and expenses, failure of
plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and unanticipated weather
changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, risks
relating to infrastructure, permitting and licenses, government regulation of the mining industry, risks relating to foreign
operations, uncertainty in the estimation and realization of mineral resources and mineral reserves, quality and marketability of
mineral product, environmental regulation and reclamation obligations, risks relating to litigation, government regulation of
mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims. Should one or more of these
risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results
may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the
Company has attempted to identify important risks in its MD&A and financial statements, uncertainties and factors which could
cause actual results to differ materially, there may be others that cause results not be as anticipated, estimated or intended. The
Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise
required by applicable law. Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the
adequacy or accuracy of this release.