During the third quarter of 2018, the Company completed an update to the Mineral Resource estimate at the Filo del Sol Project
(the "Project"), with an effective date of June 11, 2018. The updated Mineral Resource estimate is
highlighted by the successful conversion of previously Inferred material to the Indicated category, resulting in an overall
increase in the tonnage of the Indicated category by 14%, to 425.1 million tonnes. In addition, the contained metals within the
Indicated category have also increased as follows:
- The total Indicated contained gold in all zones increased by 12% to 4.4 million ounces;
- The total Indicated contained copper in all zones increased by 12% to 3.1 billion pounds; and
- The total Indicated contained silver in all zones increased by 34% to 147 million ounces.
The increases in the tonnage and contained metals within the Mineral Resource estimate's Indicated category mark the
successful achievement of a key objective of the Company's recent 2017/2018 field program, which was to successfully convert
material previously categorized as Inferred to Indicated, so as to maximize the amount of material available for inclusion in the
Preliminary Feasibility Study ("PFS"), as appropriate.
Consistent with the previous Mineral Resource estimate, the updated Mineral Resource estimate is comprised of four distinct
mineral zones: an uppermost gold oxide ("AuOx") zone, a copper-gold oxide ("CuAuOx") zone, and a silver zone, all of which is
underlain by a copper-gold sulphide ("Sulphide") zone. The updated Mineral Resource estimate, segregated by zone, is summarized
in the following table.
|
|
|
|
|
|
|
|
|
|
Zone
|
Cutoff
|
Category
|
Tonnes
|
Cu
|
Au
|
Ag
|
lbs Cu
|
Ounces Au
|
Ounces Ag
|
(millions)
|
(%)
|
(g/t)
|
(g/t)
|
(millions)
|
(thousands)
|
(thousands)
|
AuOx
|
0.20 g/t Au
|
Indicated
|
49.9
|
0.04
|
0.42
|
3.0
|
45
|
679
|
4,810
|
Inferred
|
20.8
|
0.08
|
0.34
|
2.4
|
35
|
226
|
1,580
|
CuAuOx
|
0.15 % CuEq
|
Indicated
|
259.2
|
0.38
|
0.29
|
2.7
|
2,166
|
2,385
|
22,500
|
Inferred
|
74.3
|
0.29
|
0.31
|
2.1
|
481
|
735
|
5,040
|
Ag
|
20 g/t Ag
|
Indicated
|
40.5
|
0.50
|
0.43
|
87.6
|
446
|
562
|
114,180
|
Inferred
|
8.8
|
0.36
|
0.43
|
79.3
|
70
|
121
|
22,400
|
Sulphide
|
0.30 % CuEq
|
Indicated
|
75.5
|
0.27
|
0.34
|
2.2
|
451
|
813
|
5,370
|
Inferred
|
71.2
|
0.30
|
0.33
|
2.5
|
470
|
750
|
5,740
|
Total
|
Indicated
Inferred
|
425.1
|
0.33
|
0.32
|
10.7
|
3,108
|
4,439
|
146,860
|
175.1
|
0.27
|
0.33
|
6.2
|
1,056
|
1,832
|
34,760
|
1 -
|
CuAuOx copper equivalent (CuEq) assumes metallurgical recoveries of 82% for
copper, 55% for gold and 71% for silver based on preliminary metallurgical testwork, and metal prices of US$3/lb copper,
US$1300/oz gold, US$20/oz silver. The CuEq formula is: CuEq=Cu+Ag*0.0084+Au*0.4239;
|
2 -
|
Sulphide copper equivalent (CuEq) assumes metallurgical recoveries of 84%
for copper, 70% for gold and 77% for silver based on similar deposits, as no metallurgical testwork has been done the
Sulphide mineralization, and metal prices of US$3/lb copper, US$1300/oz gold, US$20/oz silver. The CuEq formula is:
CuEq=Cu+Ag*0.0089+Au*0.5266;
|
3 -
|
The Qualified Person for the resource estimate is James N. Gray, P.Geo. of
Advantage Geoservices Ltd.;
|
4 -
|
All figures are rounded to reflect the relative accuracy of the
estimate;
|
5 -
|
Mineral Resources are not Mineral Reserves and do not have demonstrated
economic viability;
|
6 -
|
The resource was constrained by a Whittle® pit shell using the
following parameters: Cu $3/lb, Ag $20/oz, Au $1300/oz, slope of 45°, a mining cost of $2.50/t and an average process
cost of $13.26/t.
|
The updated Mineral Resource estimate is now being incorporated into the PFS, which continues to be targeted for completion by
the first quarter of 2019. Metallurgical testwork results will be the next integral input to the PFS, and this phase of testing
is now nearing completion.
Commenting on the Company's current status, Adam Lundin, President and CEO, noted, "We are now
close to the completion of the PFS for our Filo del Sol Project, which is still expected by Q1 2019. I am confident that the
results will confirm that we have a robust standalone project that will deliver strong value to our shareholders. At the same
time, the current resource of the Project, which forms the basis of the PFS, is based upon drilling less than 20% of the Project
area. As such, in tandem with the completion of the PFS and moving forward the current Project, we will shortly commence the
2018/2019 field program where we will dedicate drill metres to test the prospectivity of a potential copper porphyry system below
our current resource. The upside to the Project is significant and based upon industry analogues we are excited about the
potential of the area."
OUTLOOK
The Company continues to work towards completion of the PFS, which is being led by Ausenco Engineering Canada Inc. and is
targeted for completion by the first quarter of 2019. The PFS will incorporate the updated Mineral Resource estimate and will
explore several opportunities to enhance the value of the Filo del Sol Project, as identified in the PEA, including:
- Evaluating opportunities to optimize the mine plan and production schedules by smoothing out the production profile and
bringing forward copper revenues; and
- Increasing metallurgical recoveries with further test work and optimization.
The refinement of metallurgical recoveries, which is deemed a key area of focus and value creation for the Filo del Sol
Project, began in April 2018, using material collected during the 2017/2018 field program. This
current phase of metallurgical testwork is now nearing completion and results will be incorporated into the PFS.
With the completion of an updated Mineral Resource estimate and the metallurgical testwork program progressing as scheduled,
the PFS is on target for completion by the first quarter of 2019, which will be the next landmark for the Company's continuing
advancement of the Filo del Sol Project. In advance of receiving the PFS results, which will guide the necessary steps to
undertaking a feasibility study on the project, the Company has planned its 2018/2019 field program around certain known or
anticipated informational requirements for feasibility-level studies, such as the need to conduct hydrogeological testwork to
confirm a source of water for the project. Data generated through this advance work should facilitate the eventual undertaking of
a feasibility study in the future. In addition, to maximize utilization of the field camp and personnel during the season, the
2018/2019 field program also plans to test the project's significant exploration upside. As mentioned, to date, only
approximately 20% of the project area has been explored, the current resource remains open for expansion, and there is potential
for a copper porphyry system below the current resource. Preparations for this upcoming field program are currently underway, and
results are expected to be available in the first and second quarters of 2019.
FINANCIAL RESULTS
(In thousands of Canadian dollars, except per share amounts)
|
|
|
Three months ended
|
Nine months ended
|
|
|
September 30,
|
September 30,
|
|
|
2018
|
2017
|
2018
|
2017
|
Exploration and project investigation
|
|
2,208
|
1,227
|
18,935
|
11,414
|
General and administration ("G&A")
|
|
1,608
|
1,311
|
3,939
|
2,731
|
Net loss
|
|
3,865
|
2,549
|
22,699
|
14,115
|
Basic and diluted loss per share
|
|
0.05
|
0.04
|
0.32
|
0.23
|
The financial information in this table were selected from the Company's
condensed interim consolidated financial statements for the three and nine months ended September 30, 2018 (the
"Financial Statements"), which are available on SEDAR at www.sedar.com and the Company's website www.filo-mining.com.
|
SELECTED FINANCIAL INFORMATION
(In thousands of Canadian dollars)
|
|
September 30,
|
December 31,
|
|
|
2018
|
|
2017
|
Cash
|
|
3,257
|
|
2,417
|
Working capital
|
|
4,854
|
|
1,462
|
Mineral properties
|
|
6,993
|
|
6,479
|
Total assets
|
|
13,009
|
|
10,193
|
The financial information in this table were selected from the Financial
Statements, which are available on SEDAR at www.sedar.com and the Company's website www.filo-mining.com.
|
The Company incurred a net loss of $3.9 million during the current quarter, comprised of
$2.2 million and $1.6 million in exploration and project
investigation costs and G&A costs, respectively, compared to a net loss of $2.5 million for the
three months ended September 30, 2017. The variance is primarily due to relative levels of
exploration activity undertaken during the respective periods. Specifically, the larger net loss incurred during the three months
ended September 30, 2018 is due to the higher costs associated with the undertaking of a PFS study
on the Filo del Sol Project during the period, which is a more advanced, detailed and costly study as compared to the preliminary
economic assessment that was in progress during the 2017 comparative period.
LIQUIDITY AND CAPITAL RESOURCES
As at September 30, 2018, the Company had cash of $3.3 million and
net working capital of $4.9 million, compared to cash of $2.4 million
and net working capital of $1.5 million, as at December 31, 2017. The
increase in the Company's cash and net working capital is due primarily to aggregate net proceeds totaling $24.4 million received from the Financings, which closed on February 28, 2018. As
at September 30, 2018, this cash inflow has been largely partially offset by funds directed towards
advancing the Filo del Sol Project, and to a lesser extent, $0.5 million in relation to the annual
option payment made for the Tamberias property in June 2018, funds spent for general corporate
purposes, and repayment of a short-term credit facility used by the Company prior to closing of the Financings, as announced by
the Company on January 12, 2018.
Moving forward, the Company expects that the majority of its treasury will be used to complete the PFS, which is currently
underway, and to fund ongoing work programs to advance the Filo del Sol Project.
Based on Filo Mining's financial position at September 30, 2018, the Company anticipates the
need for further funding to support a planned field program at its South American operations. The Company is currently evaluating
potential additional sources of financing for its field program and operations. Historically, capital requirements have been
primarily funded through equity financing, joint ventures, disposition of mineral properties and investments, and the use of
short-term credit facilities. Management is confident that additional sources of funding will be secured to fund planned
expenditures for at least twelve months from September 30, 2018.
About Filo Mining
Filo Mining is a Canadian mineral exploration company which holds a 100% interest in the Filo del Sol Project on the border of
Argentina's San Juan Province and Chile's adjacent Region III.
Filo del Sol is located between the prolific Maricunga and El Indio Gold Belts, two major mineralized trends that contain such
deposits as Caspiche, La Coipa, Veladero, and El Indio. The region is mining-friendly and hosts a number of large-scale mining
operations. The project area is covered under the Mining Integration and Complementation Treaty between Chile and Argentina, which provides the framework for the development of
cross border mining projects. Built on a foundation of experienced management and focused on advancing exploration projects in
Chile and Argentina, Filo Mining is well positioned to build
shareholder value through discovery and resource development.
Qualified Person
The scientific and technical disclosure for the Filo del Sol Project included in this news release have been reviewed and
approved by Bob Carmichael, P. Eng. (BC) and/or James Beck,
B.A.Sc., P.Eng. Mr. Carmichael is Filo Mining's Vice-President of Exploration and a Qualified Person under National Instrument
43-101 Standards of Disclosure for Mineral Projects ("NI43-101"). Mr. Beck is Filo Mining's Vice-President of Corporate
Development and Projects and is also a Qualified Person under NI43-101.
Additional information
The technical information relating to the PEA is based on a Technical Report for a Preliminary Economic Assessment on the Filo
del Sol Project, Region III, Chile and San Juan Province, Argentina dated December 18, 2017, with an effective date of November 6, 2017 (the "Technical Report"), which was prepared for Filo Mining by SRK Consulting (Canada) Inc ("SRK"). The Qualified Persons, as defined under NI 43-101, responsible for the Technical Report
are Fionnuala Devine, P. Geo., Merlin Geosciences Inc., Carl E.
Defilippi, RM SME, Kappes, Cassiday & Associates, Giovanni Di Prisco, PhD., P.Geo.,
Terra Mineralogical Services Inc., James N. Gray, P. Geo., Advantage Geoservices Limited,
Robert McCarthy, P. Eng., SRK, Cameron Scott, P. Eng., SRK, and
Neil Winkelmann, FAusIMM, SRK, all of whom are independent of Filo Mining. The Technical Report is
available for review under the Company's profile on SEDAR at www.sedar.com and on the Company's website at www.filo-mining.com.
The Company's condensed interim consolidated financial statements for the three and nine months ended September 30, 2018 and related management's discussion and analysis are available on the Company's website at
www.filo-mining.com or under its profile on SEDAR at www.sedar.com.
Filo Mining is listed on the TSX-V and Nasdaq First North Exchange under the trading symbol "FIL". Pareto Securities AB is the
Company's Certified Adviser on Nasdaq First North.
This information was submitted by Filo Mining Corp. for publication, through the agency of the contact person set out below,
on November 9, 2018 at 6:00 pm Pacific time.
On behalf of the board of directors of Filo Mining,
Adam Lundin, President and CEO
Filo Mining Corp.
Cautionary Note Regarding Forward-Looking Statements
Certain statements made and information contained herein in this press release constitutes "forward-looking information" and
forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information")
concerning the business, operations, financial performance and condition of Filo Mining. The forward-looking information
contained in this press release is based on information available to the Company as of the date of this press release. Except as
required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this
forward-looking information. Generally, any statements that express or involve discussions with respect to predictions,
expectations, beliefs, plans, projections, objectives, assumptions or future events or performance, (often, but not always,
identified by words or phrases such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled",
"estimates", "forecasts", "intends", "projects" , "estimates", "budgets", "scheduled", "forecasts", "assumes", "intends",
"strategy", "goals", "objectives", "potential", "possible", "anticipates" or "does not anticipate", or "believes", or variations
of such words and phrases or statements that certain actions, events, conditions or results "will", "may", "could", "would",
"should", "might" or "will be taken", "will occur" or "will be achieved" or the negative connotations thereof and similar
expressions) are not statements of historical fact and may be forward-looking statements.
All statements other than statements of historical fact may be forward-looking statements. Forward-looking information is
necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other
factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially
different from those expressed or implied by such forward-looking information, including but not limited to: risks and
uncertainties relating to, among other things, the inherent uncertainties regarding mineral resource estimates, cost estimates,
changes in commodity prices, currency fluctuation, financings, unanticipated resource grades, infrastructure, results of
exploration activities, cost overruns, availability of materials and equipment, timeliness of government approvals, taxation,
political risk and related economic risk and unanticipated environmental impact on operations as well as other risks, and
uncertainties and other factors, including, without limitation, those referred to in the "Risks and Uncertainties" section of the
Company's most recent MD&A and/or Annual Information Form, under the heading "Risks Factors", and elsewhere, which may cause
the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed
or implied by such forward-looking information.
The Company believes that the expectations reflected in the forward-looking information included in this press release are
reasonable but no assurance can be given that these expectations will prove to be correct and such forward-looking information
should not be unduly relied upon. Information contained in this press release is as of the date of this press
release. In particular, this press release contains forward-looking information pertaining to the assumptions used in the
PEA for the Filo del Sol project, the assumptions used in the mineral resources estimates for the Filo del Sol project,
including, but not limited to, geological interpretation, grades, metal price assumptions, metallurgical and mining recovery
rates, geotechnical and hydrogeological conditions, as applicable; ability to develop infrastructure; assumptions made in the
interpretation of drill results, geology, grade and continuity of mineral deposits; expectations regarding access and demand for
equipment, skilled labour and services needed for exploration and development of mineral properties; and that activities will not
be adversely disrupted or impeded by exploration, development, operating, regulatory, political, community, economic and/or
environmental risks. In addition, this press release contains forward-looking information pertaining to the undertaking of
and timing for the completion of a Pre-Feasibility Study; expected timing for the results of metallurgical testwork;
ability to secure additional financing and/or the quantum and terms thereof; exploration and development plans and expenditures;
the timing and nature of studies and any potential development scenarios; opportunities to improve project economics; the success
of future exploration activities; potential for resource expansion; potential for the discovery of new mineral deposits; ability
to build shareholder value; expectations with regard to adding to mineral resources through exploration; expectations with
respect to the conversion of inferred resources to an indicated resources classification; ability to execute planned work
programs; estimation of commodity prices, mineral resources, costs, and permitting time lines; ability to obtain surface rights
and property interests; currency exchange rate fluctuations; requirements for additional capital; government regulation of mining
activities; environmental risks; unanticipated reclamation expenses; title disputes or claims; limitations on insurance
coverage; and other risks and uncertainties.
Forward-looking information is based on certain assumptions that the Company believes are reasonable, including that the
current price of and demand for commodities will be sustained or will improve, the supply of commodities will remain stable, that
the general business and economic conditions will not change in a material adverse manner, that financing will be available if
and when needed on reasonable terms and that the Company will not experience any material labour dispute, accident, or failure of
plant or equipment. These factors are not, and should not be construed as being, exhaustive. Although the Company has
attempted to identify important factors that would cause actual results to differ materially from those contained in
forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or
intended. There can be no assurance that such statements will prove to be accurate, as the Company's actual results and
future events could differ materially from those anticipated in such statements, as a result of the factors discussed in the
"Risk and Uncertainties" section of the Company's most recent management's discussion and analysis and elsewhere and in the "Risk
Factors" section in the Company's most recent Annual Information Form, which are available under the Company's profile on SEDAR
at www.sedar.com. All of the forward-looking information
contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance
on forward-looking information due to the inherent uncertainty thereof.
Statements relating to "mineral resources" are deemed to be forward looking information, as they involve the implied
assessment, based on certain estimates and assumptions, that the mineral resources described can be profitably produced in the
future.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release
SOURCE Filo Mining Corp.
View original content to download multimedia: http://www.newswire.ca/en/releases/archive/November2018/09/c2777.html