Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Wallbridge Commences Initial Drilling Program at Beschefer

T.WM

Canada NewsWire

TORONTO, Nov. 27, 2018 /CNW/ - Wallbridge Mining Company Limited (TSX:WM, FWB: WC7) ("Wallbridge" or the "Company") is pleased to announce that it has commenced drilling at its recently-optioned Beschefer property ("Beschefer" or "Beschefer Project").

Wallbridge Commences Initial Drilling Program at Beschefer (CNW Group/Wallbridge Mining Company Limited)

Since entering into the option agreement to acquire 100 % of Beschefer (see Wallbridge Press Release dated October 17, 2018), Wallbridge's exploration team has carried out a systematic review of historic drill core and project data to better understand the controls on gold deposition and, most importantly, the formation of high grade domains within the B-14 shear zone. This work was in preparation for resource drilling and future maiden resource estimation.

Wallbridge's initial drill program, has commenced and will consist of approximately 1,500 metres of surface drilling and is designed to test the continuity of two known high-grade shoots within the B-14 shear.

"The relatively wide-spaced drilling carried out by previous operators has already defined a mineralized system, the continuous large-scale gold-bearing structure known as the B-14 Zone. Several high-grade domains within this shear zone highlight the excellent grade potential that exists in this system," stated Marz Kord, President & CEO of Wallbridge. "Following our strategy of building a gold production pipeline in the emerging Sunday Lake-Selbaie Belt, our initial objective is to prove the continuity of discrete high-grade shoots and to continue the same exploration success as at Fenelon.  If this initial program is successful, we will be planning for a more aggressive resource expansion program and the completion of a maiden resource estimate."

About the Beschefer Project

The Beschefer Project covers 647 hectares and is located in the Northern Abitibi Greenstone Belt, 14 km east of the past-producing polymetallic Selbaie Mine, 45 km northeast of the Casa Berardi Mine and 28 km from Wallbridge's Fenelon Gold Property. Historically, the area has mainly been explored for volcanogenic massive sulfide deposits similar to the Matagami camp and the Selbaie Mine.

Gold mineralization was discovered in the B-14 Zone in 1995 by Billiton Canada Inc. and the property has seen very limited exploration before the involvement by Excellon in 2011, which completed approximately 17,000 metres of drilling up to 2013. Excellon's programs produced very positive results, extending the B-14 mineralization down to almost 600 metres vertical depth, discovering the upper shear zone and intersecting the highest-grade intersections on the property, including 55.63 g/t Au over 5.57 metres and 13.07 g/t gold over 8.75 metres. Excellon's primary focus is on production and exploration at its Platosa Mine and Miguel Auza Property in Mexico. There has been no exploration at Beschefer since 2013.

A summary of historic drill hole results is reported in Table 1 and Figure 1 below.

Table 1. Beschefer Project Historic Assay Highlights

Drill Hole

From

To

Length

True

Width

Au

Zone

Year

Company


(m)

(m)

(m)

(m)

(g/t)




BE13-038

323.36

328.93

5.57

5.41

55.63

B-14

2013

Excellon

BE12-014

220.75

229.50

8.75

7.80

13.07

B-14

2012

Excellon

including...

228.00

229.50

1.50

1.34

58.50

B-14

2012

Excellon

B14-35

204.00

212.00

8.00

7.28

10.28

B-14

1997

Les Mines Selbaie

including...

204.40

205.00

0.60

0.55

86.74

B-14

1997

Les Mines Selbaie

BE11-003

179.42

183.20

3.78

3.69

12.40

B-14

2011

Excellon

B14-6

156.10

184.10

28.40

28.22

3.56

B-14

1996

Les Mines Selbaie

including...

178.60

184.10

5.50

5.47

7.42

B-14

1996

Les Mines Selbaie

BE13-042

454.93

463.65

8.72

8.00

5.16

B-14

2013

Excellon

including...

459.37

459.67

0.30

0.28

91.4

B-14

2013

Excellon

BE13-043

117.61

120.10

2.49

2.30

6.65

Upper

2013

Excellon

SBJ-06-01

201.80

211.80

10.00

9.03

4.46

B-14

2006

Seagreen

BE12-006

114.95

122.75

7.80

6.89

4.54

B-14

2012

Excellon

BE12-030

362.94

369.00

6.06

5.98

3.56

B-14

2012

Excellon

B14-43

187.30

187.80

0.50

0.50

29.71

Upper

1997

Les Mines Selbaie

B14-4

159.90

160.70

0.80

0.79

16.94

B-14

1996

Les Mines Selbaie

BE11-001

185.46

194.84

9.38

9.24

3.01

B-14

2011

Excellon

BE13-045

559.20

570.30

11.10

9.40

3.03

B-14

2013

Excellon

including...

564.30

570.30

6.00

5.08

4.25

B-14

2013

Excellon

 

Figure 1: Beschefer Inclined Long Section

The Qualified Persons responsible for the technical content of this press release are Marz Kord, P. Eng., M. Sc., MBA, President & CEO and Attila Péntek, P.Geo., Ph.D., Vice President Exploration for Wallbridge Mining Company Limited.

About Wallbridge Mining

Wallbridge is establishing a pipeline of projects that will support sustainable production and revenue as well as organic growth through exploration and scalability.

Wallbridge is currently developing its 100%-owned high-grade Fenelon Gold property in Quebec with ongoing exploration and a bulk sample in 2018. Wallbridge is also pursuing other additional advanced-stage projects which would add to the Company's near-term project pipeline. These discussions benefit from the operating capabilities Wallbridge demonstrated by safely and efficiently mining the Broken Hammer deposit in Sudbury, which was completed in October 2015. As part of this strategy, the Company recently optioned the Beschefer Project, an advanced gold property with proven size and grade-potential near Fenelon Gold. Wallbridge is also continuing partner-funded exploration on its large portfolio of nickel, copper, and PGM projects in Sudbury, Ontario, with a focus on its high-grade Parkin project.

Wallbridge also has exposure to exploration for copper and gold in Jamaica and British Columbia through its 11.3% ownership of Carube Copper Corp. (CUC:TSX-V, formerly Miocene Resources Limited, a Wallbridge spin-out of its BC assets).

This press release may contain forward-looking statements (including "forward-looking information" within the meaning of applicable Canadian securities legislation and "forward-looking statements" within the meaning of the US Private Securities Litigation Reform Act of 1995) relating to, among other things, the operations of Wallbridge and the environment in which it operates. Generally, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Wallbridge has relied on a number of assumptions and estimates in making such forward-looking statements, including, without limitation, the costs associated with the development and operation of its properties. Such assumptions and estimates are made in light of the trends and conditions that are considered to be relevant and reasonable based on information available and the circumstances existing at this time. A number of risk factors may cause actual results, level of activity, performance or outcomes of such exploration and/or mine development to be materially different from those expressed or implied by such forward-looking statements including, without limitation, whether such discoveries will result in commercially viable quantities of such mineralized materials, the possibility of changes to project parameters as plans continue to be refined, the ability to execute planned exploration and future drilling programs, the need for additional funding to continue exploration and development efforts, changes in general economic, market and business conditions, and those other risks set forth in Wallbridge's most recent annual information form under the heading "Risk Factors" and in its other public filings. Forward-looking statements are not guarantees of future performance and such information is inherently subject to known and unknown risks, uncertainties and other factors that are difficult to predict and may be beyond the control of Wallbridge. Although Wallbridge has attempted to identify important risks and factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors and risks that cause actions, events or results not to be as anticipated, estimated or intended. Consequently, undue reliance should not be placed on such forward-looking statements. In addition, all forward-looking statements in this press release are given as of the date hereof.

Wallbridge disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws. The forward-looking statements contained herein are expressly qualified by this disclaimer.

SOURCE Wallbridge Mining Company Limited

View original content to download multimedia: http://www.newswire.ca/en/releases/archive/November2018/27/c1793.html



Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today