VANCOUVER, BC / ACCESSWIRE / December 5, 2018 / Noram Ventures Inc. ("Noram") (TSX - Venture: NRM / Frankfurt:
N7R / OTCBB: NRVTF) is pleased to provide an update on the Phase III drill program on Noram's flagship Zeus property in the
Clayton Valley, Nevada, USA.
The first Noram Ventures Phase III core hole, CVZ-45, was completed on November 19, 2018 at the planned depth of 100 feet (30.5
meters). The hole was located approximately 1150 feet (350 meters) northwest of the previously announced 43-101 compliant inferred
resource of 17 million tonnes at a grade of 1060 ppm Li. The complete NI 43-101 Technical Report is available on SEDAR.
The core has been logged and sampled and the samples have been shipped to ALS Laboratories in Reno, Nevada, USA for analysis.
The geologic log shows that the top 85 feet (26 meters) of the hole contained olive green claystone and mudstone very similar to
that seen in holes within the resource area. The bottom 15 feet (4.6 meters) contained gray, green and brown limestone, sand and
conglomerate along with some mudstone. CVZ-45 may well be deepened at a later time to determine the significance of the sandy,
conglomeratic layers in the lower part of this hole.
"Noram management is pleased to have the Phase III drill program underway. We are already seeing similarities in the new drill
core and those of the resource area," stated Mr. Mark Ireton, President and CEO. "As the program progresses, we anticipate that the
olive green claystone will be intersected in more drill holes, and that further exploration at depth will be warranted to fully
delineate the lithium clay resource on the property."
At present, 7 drill holes of the intended 17 have been completed to a depth of approximately 100ft. As indicated in the map
below, all 7 holes, (CVZ-45 through CVZ-51), were drilled to the north-east of the resource area other than CVZ-51. All holes
completed to date, with the exception of CVZ-49, have intersected green mudstones and claystones and, in some cases, the chemically
reduced blue and black claystones reported by Cypress Development on their adjacent property.
Noram is moving forward aggressively with this program. Drill teams are currently operating 24 hours a day in two shifts with
the expectation of completing the Phase III program in the next 7-10 days. Samples are being shipped to ALS Labs in Reno as
drilling progresses. The Company anticipates the turn around of the first core assay results in the near future.
Phase III Drill Program. 7 holes completed to date (red) and the remaining 10 holes to be drilled (green). The current
inferred resource area referred to in the NI 43-101 Technical Report (orange).
The technical information contained in this news release has been reviewed and approved by Bradley C. Peek MSc. and Certified
Professional Geologist who is a Qualified Person with respect to Noram's Clayton Valley Lithium Project as defined under National
Instrument 43-101.
About Noram Ventures Inc.
Noram Ventures Inc. (TSX - Venture: NRM / Frankfurt: N7R / OTCBB: NRVTF) is a Canadian based junior exploration company, with a
goal of developing lithium deposits and becoming a low - cost supplier for the burgeoning lithium industry. The Company's primary
business focus since formation has been the exploration of mineral projects. Noram's long term strategy is to build a
multi-national lithium minerals company to produce and sell lithium into the markets of Europe, North America and Asia.
For further information, please visit: www.noramventures.com
ON BEHALF OF THE BOARD OF DIRECTORS
"Mark R. Ireton"
President & Director
Direct: (604) 761-9994
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain
forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties
and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those
expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements
regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to
differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although
Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable,
including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such
information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in
the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking
information, whether as a result of new information, future events or otherwise, other than as required by applicable securities
laws.
SOURCE: Noram Ventures Inc.