Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Granite Announces $34 Million Seismic Improvement Project at Oakland International Airport

GVA

Granite (NYSE: GVA) has announced the signing of a $34 million contract to implement seismic improvements to the Oakland International Airport (OAK) Perimeter Dike. This critical infrastructure project is designed to protect the airport runway from water intrusion from the adjacent San Francisco Bay. Project funding comes in part from the Federal Aviation Administration (FAA) and will be included in Granite’s third-quarter CAP.

The primary objective of this project is to enhance the seismic resilience of 4,200 LF of the OAK perimeter dike by utilizing a cement deep soil mixing construction solution (CDSM). This technique will strengthen the levee wall soils and mitigate the risk of dike failure in the event of a strong seismic event. Keller North America, Inc, a leading geotechnical specialty subcontractor, performed the CDSM scope. In addition to the 62,295 CY of CDSM scope, other work includes clearing and grubbing, constructing temporary work pads, installing wetlands protections, protecting in-place existing fuel lines, and installing 2,100 CY of additional rip rap revetment and aggregate base surfacing to restore the existing perimeter road.

“This project is a strategic win for Granite as we continue to build our portfolio of work with the Port of Oakland,” said Brent Fogg, Granite Vice President of Regional Operations. “The technical challenges and restricted access of this project will require meticulous logistical planning to ensure an efficient and safe workflow and zero impact on Airport Operations.”

The project is expected to begin in Q1 2025 and be completed in Q3 2026.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, X, Facebook, and Instagram.



Get the latest news and updates from Stockhouse on social media

Follow STOCKHOUSE Today