Post by
flashcash on Jan 25, 2021 12:31am
As can be seen
From the plan view there will be a core proven resource near surface with the rest as inferred and probable, looks like two open pits and the hinge/limb zones can be mined as a separate structure with a drift later on to underground mine the LP high grade spine. I wonder if they intertained the possibility of a joint venture for the hinge/limb structure, only needs a medium company really to help out the grade is that good.
https://greatbearresources.ca/news/great-bear-releases-seven-additional-near-surface-drill-holes-including-10.01-g-t-gold-over-34.85-m-and-15.68-g-t-gold-over/
Comment by
flashcash on Jan 25, 2021 9:59am
The hinge/ limb structure is different, they develop it and we develop the LP fault. We are happy and they are happy.