Copper assetThe grade of the deposit, at 2.3% Cu looks good, given that it can be extracted by open pit. With zinc, gold & silver the value of the ore is in the range of $200 a tonne. It is a relatively small deposit, hosting just over 100 million pounds of Cu. The question I have is what does a 1,000 tonne a day mill cost? Capex for the open pit would not be high, but mills are expensive.