RE: RE: talk from local bar
RE: RE: talk from local bar geoffs, the ore bin that i'm talking about is part of the dry end circuit or the crushing circuit , witch is what we are waiting to be completed in order to get to 3,000 tpd. The trucks unload there trucks witch go into the crucher witch is then conveyed by a conveyor belt to the top of the 6,000 ore bin, witch in the middle of this ore bin has a conveyor that goes from 6,000 ton ore bin to the sag mill .The sag mill being a primary crusher will break down the rock to a smaller size witch will the be conveyed to secondary crushers and then fed to the system.Hope not to confusing .Here pge 23
https://www.lsgold.com/files/doc_presentations/LSG2012Q3conferenceCall.pdf