Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Nickel Creek Platinum Corp T.NCP

Alternate Symbol(s):  NCPCF

Nickel Creek Platinum Corp. is a Canada-based mining exploration and development company. The Company’s principal business activity is the exploration and evaluation of nickel and platinum group metals (PGM) mineral properties in North America. The Company’s flagship asset is its 100%-owned nickel-copper PGM project, located in the Yukon Territory, Canada (Nickel Shaw Project). The Nickel Shaw project is located in the southwest of Canada's Yukon Territory, approximately 317 kilometres (km) northwest (NW) of the capital, Whitehorse. The Project has exceptional access to infrastructure, located three hours west of Whitehorse via the paved Alaska Highway, which further offers year-round access to deep-sea shipping ports in southern Alaska. The Company also maintains environmental baseline activities, considers optimization alternatives and seeks other opportunities.


TSX:NCP - Post by User

Post by Wangotango67on Oct 25, 2023 9:19pm
76 Views
Post# 35701324

846 PART 2 ( good stuff )

846 PART 2 ( good stuff )

Johnson's 2015 PEA stated...
329,569,000  M + I  tonnes
846,389,000 Inferred tonnes

2015 PEA

Mineral Resource Estimate by Category – At a 0.57 g/t Pt Eq. or 0.15% Ni Eq. cut-off (Base Case)
Category
Tonnes
(000s)
3E
(g/t)
Pt
(g/t)
Pd
(g/t)
Au
(g/t)
Ni
(%)
Cu
(%)
Co
(%)
Pt Eq.
(g/t)
Ni Eq.
(%)
Measured
92,293
0.550
0.252
0.246
0.052
0.260
0.155
0.015
1.713
0.449
Indicated
237,276
0.511
0.231
0.238
0.042
0.261
0.135
0.015
1.656
0.434
Total M&I
329,569
0.522
0.237
0.240
0.045
0.261
0.141
0.015
1.672
0.438
Inferred
846,389
0.507
0.234
0.226
0.047
0.237
0.139
0.015
1.571
0.412




What measurement creates the M + I  ?
900mL x 400mD x 300mW x 2.8 ore density 
302,400,000 tonnes ( pretty darn close )

Image ( only factor circled zone ) 100m blocking
https://image.slidesharecdn.com/prophecyplatinumpresentation-120206130514-phpapp02/75/prophecy-platinum-presentation-19-2048.jpg?cb=1671716840

So far so good...
But how did they arrive at 846,389,000 million tonnes inferred ?
This is where Johnson, Juhnson factored = 2.5 km footprint and deeper depths.
Look at the image again.
 

----------------------------------------------------------------------------------

So what happen when you move westerly going beyond the
900m initial M + I  constraint ???

You arrive at the central Zone.

What's at the Central zone ?
If you look at older charts it shows a break, shearzone with shallow intercepts.

BUT....if you refer to other images something better reveals itself.

WS 11 - 188 - 457.3m  2.11/g  Pt  Eq

WS 12 - 214362.7m 2.22/g Pt Eq

And.... the revealing of....  Backside of wellgreen.
I'll talk about backside later in post.



https://image.slidesharecdn.com/prophecyplatinummar13presentation-130308145105-phpapp01/75/prophecy-platinummar13presentation-23-2048.jpg?cb=1672287738Not%20seen%20on%20image%202013%20Drill%20Hole%20Johnson%20750+m%20Far%20East


Central Zone
Suddenly.... older drill images are replaced with, deep intercepts.
These are outside the boundary of, the circled Wellgreen zone.
Inferred = because they needed to perform infill drilling.
Infill was performed.
BUT....just like the west zone, central was never fully measured with -  M + I.

Remember ?
900mL x 400mD x 300mW x 2.8 ore density 
302,400,000 tonnes ( pretty darn close to Johnson's M + I ) 

See anything interesting in that image ?
Backside of wellgreen is just as large as fron side.
First upper image shows red zone extends to opposite side
which would place the surface N to S width to 800 - 100m wide.

I only used 300m width to arrive @ 302 million tonnes.
= 2015 PEA ( close to 329 million tonnes )

Which paints a new picture of,
Central's long intercepts are = inferred
Backside wellgreen = all new tonnage

Depending on which image you look at,
WS 11 - 188 - 457.3m  2.11/g  Pt  Eq

This hole was drilled near peak of Central zone.
Another image shows backside placement and.....open at depth.

LOOK...... lower image.
Notice backside of wellgreen how much larger the footprint
of red mineralization.

Image is in.... 200m blocking
= 1000m from south to north.
= no longer 300m footprint.
= backside looks larger than the front of, wellgreen. ( bottom image )
https://image.slidesharecdn.com/prophecyplatinumpresentation-120206130514-phpapp02/75/prophecy-platinum-presentation-22-2048.jpg?cb=1671716840



So why is Drill Hole 188 so important ?
This image shows 2 mineral zones ( upper and lower ultramafics )
Peridotite = Upper

https://image.slidesharecdn.com/prophecyplatinummar13presentation-130308145105-phpapp01/75/prophecy-platinummar13presentation-17-2048.jpg?cb=1672287738

What was sent to XPS ?
Peridotites.  ( 1/2 legnth whole cores = points to upper ultramafics =  peridotites )
Lower is different geology but still 1/2 mineralized.

This link image shows the 13 holes ( 7 outside the wellgreen.
https://mma.prnewswire.com/media/553093/Wellgreen_Platinum_Ltd__Wellgreen_Platinum_Provides_2017_Drill_P.jpg
= Many from Central.

XPS can't handle Peridotites, at least not Yukon's - lol.
But Timmin's area is perfectly fine....

What did the Practical Entitlement do to....  inferred 846 mil tonnes ?
86% reduction.
June 2017 press release.

SOLUTION ?
1- could've sent lower hole ultramafics.
2- use anothers diff extraction suited to peridotites
3- apply phase 1 recoveries ( bulk ) no problem with peridotites
= activates 846 million tonnes  ( which has seen infill drilling )

SUM ?
Hole 188 is an important hole.
If drilled atop or top backside - it reveals a much deeper depth of mineralization.
Which brings into question, 1000m N to S width of, Wellgreen.
And.... 846 million tonne inferred.

Diff extraction - or phase 1 = would reactivate = 846  million tonnes
They did perform infilling.

What else is interesting ?
Miller (1991) found that the disseminated mineralization is preferentially enriched in copper, platinum, palladium and gold compared to the massive sulphides. Sulphur isotope data suggest that most of the sulphur was assimilated from deep crustal sources and was not derived from footwall rocks.

https://data.geology.gov.yk.ca/Occurrence/14129#InfoTab



Peridotite = has the disseminated mineralization.
Same minerals - all one source = no division accept some have more silicate.
= somewhat destroys the concept of....using only half whole cores.
= especially when phase 1 had no issue with silicates. ( peridotite )


I'd like to chat with Johnson...
Ask him where he drilled the - 750+m hole.

Wellgreen is also considered the East zone.
Go back far enough in the historicals... there was only - east and west.

What if far east was the backside of, wellgreen ?
Northern side.

Something to ponder.

Seems several juniors shifted the boundaries and names over the years.
Even burwash which was northerly, now overlays east and, far east going  away
from main wellgreen.

If 3 deep bore holes drilled Burwash, and if Burwash  now overlays east, far east,
and press didn't reveal assays only states silicate/ then....where were these holes ?
North side of wellgreen - or east,  far east  or, original burwash ?

I've even seen an image showing west zone having it's own, east and west.
I like seeing goal post boundaries remain same from start to finish.


Any wonder why this project is a bugger to, understand.
lol



Cheers....




 