RE:RE:RE:RE:Q2 results next weekYou can call it whatever you want.
I see a very profitable mine at Orovalle, and the AISC you're presenting could be cut in half if the inventory is sold.
I see relatively high CAPEX and significant resource growth and I see maintained production figures i.e 14koz Au and 2 Mlbs Cu per quarter during Q3 and Q4.
Of specific interest is the results from Taguas later this month, that is a mine that could take us from a redicolous 40MCAD mcap to 1BUSD+ mcap longterm.
GLTA
yogi33 wrote: The more things change, the more they stay the same
OroValle
- Quarterly gold production of 10,785 ounces, 24% lower than previous quarter due to 12% lower throughput and 11% lower grade. The start of the quarter was impacted by infrastructure issues in one sector of the mine; the mine schedule was successfully rectified to be on track to meet FY2021 guidance.
- Copper production was 1.4 million pounds, 34% lower than previous quarter, due 12% lower throughput and 26% lower grade.