Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Orvana Minerals Corp T.ORV

Alternate Symbol(s):  ORVMF

Orvana Minerals Corp. is a Canada-based multi-mine gold-copper-silver company. The Company is involved in the evaluation, development and mining of base metal deposits. The Company owns and operates El Valle Mine and Carles Mine, which is situated in Asturias, Northern Spain (collectively El Valle) and is managed by its wholly owned subsidiary, Orovalle Minerals S.L. (Orovalle). In addition to El Valle, it owns certain mineral rights located in the region of Asturias. It also owns the Don Mario Operations (Don Mario) in San Jose de Chiquitos, Southeastern Bolivia and is managed by its wholly owned subsidiary, Empresa Minera Paititi S.A. (EMIPA). It consists of around 10 contiguous mineral concessions covering approximately 53,325 hectares (ha). Through its subsidiary Orvana Argentina S.A., the Company holds its 100 % owned Taguas Property, which is situated in the Province of San Juan, Argentina, and consists of approximately 15 mining concessions covering approximately 3,273.87 ha.


TSX:ORV - Post by User

Comment by ganndolph1on Nov 12, 2021 8:46pm
202 Views
Post# 34122221

RE:RE:Orvana Confirms New Mineralized Structure in El Valle

RE:RE:Orvana Confirms New Mineralized Structure in El Valle
xyz_trader1 wrote:

Area E2 has a mineral resource estimate of 140,000 tones, with 3.84 g/t Au and 0.34 %Cu, of inferred material. The resource is estimated using a gold equivalent cut off grade of 2.52 g/t, gold price of US$ 1,700 per ounce, copper price of US$ 3.25 per pound and a silver price of US$ 20 per ounce. It is noted that mineral resources that are not mineral reserves do not have demonstrated economic viability. This resource estimate is the initial estimate for Area E2, which will be the start of a larger volume definition, subject to be verified with additional drilling.

Further 2,000 DDH meters are planned for Area E2 during the next 12 months, targeting the North and South sectors, looking for a robust increase in the resource. DDH's targeting resource increase at depth, are scheduled after the northbound and southbound efforts, principally due to waiting for the development of galleries to drill from.


im not good with these calculations of resource. Need gandolph.

but i believe this new area structure it is around 18 thousand ounces of GOLD!

not sure of the copper amount.


xyz




My number is 581,975 metric tons grading 5.56 g/t gold, 6.0 g/t silver, and 0.37 percent Copper, so that is 193,995 ounces of gold,  112,282 ounces of silver, and 4.7 million pounds of copper.

My model is based on a conservative assumption of 50 meters of vertical continuity on the north south cross section depicted in Figure 3 of Orvana's news release. The wider cross section depicted  in Figure 2 is about 130 meters wide, but I modeled it as 4 ore veins continuous over a 75 meter width. The north south cross section in Figure 3 is 500 meters in length but I modeled it as continuous over 460 meters to avoid double counting ore modeled in the east west cross section in Figure 2.

In terms of average copper ore grade, my estimate of 0.37 percent copper is pretty close to Orvana's number of 00.34 percent copper.  But my gold grade is higher because my estimate is an uncapped gold ore grade where I have eliminated ore veins which are below the 2.52 g/t curoff grade. So I assume that any sub economic ore veins will not get mined and are thus excluded from my resource estimate.

Obviously, Orvana is using highly conservative assumptions in order to only estimate the E2 zone at only140,000 metric tons.

ganndolph 
<< Previous
Bullboard Posts
Next >>