Well this newsis on the the BIG side. This is a very real foot in the door opportunity for PYR. I really like this paragraph.
.Under the terms of the contract, PyroGenesis will design and build a system tailored for lab-scale cement production applications. The system will include a plasma torch, a refractory The system was cofurnace, and the required gas, power, and cooling components and peripherals.ntracted to provide the client the type of increased power and heat levels required for advanced cement development and testing, but without the fossil fuels and resultant emissions a gas-fueled system would normally generate. Subsequent phases may require a refractory lined reactor and other systems for additional development.