RE:RE:Looks likeThere is no way this is up and running in 2026. Detailed Engineering and Construction will be at least 2.5 years minimum. They still have to raise the capital. All signs showing green so far, but it's going to cost time and money and a lot of bumps along the way. Those with patience may be rewarded, those that don't will be part of the problem along the way. I personally increased my position on this and it's all in my TFSA. I hope I don't get a hammer to the face as I have been holding for years on this one.