Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Gratomic Inc V.GRAT

Alternate Symbol(s):  CBULF

Gratomic Inc. is a Canada-based junior exploration company that is engaged in the acquisition and exploration of assets located primarily in Canada and Namibia. The Company is focused on supplying graphite. The Company’s projects include Buckingham Graphite property, Aukam Graphite Project, Capim Grosso, and Jacobina & Igrapiuna Graphite Projects. The Buckingham Graphite property covers approximately 480 hectares in eight claim blocks and is located seven kilometers (km) northwest of Buckingham, Quebec, Canada. The Aukam Graphite Project is located in southern Namibia close to the port city of Luderitz. The property is comprised of exclusive prospecting licenses (EPL) 3895, EPL 6710, EPL 7512 and EPL 7513 that cover an area of 141,600 hectares in the Karas region of southern Namibia. Capim Grosso is situated at the center east portion of the Bahia province, approximately 280 km from the port of Salvador, at the province capital, and 166km from Feira de Santana.


TSXV:GRAT - Post by User

Post by GabeBuffeton Jul 07, 2022 11:48am
91 Views
Post# 34808526

Gratomic announces first batch of production

Gratomic announces first batch of production

Gratomic Announces First Batch of Production Representative Samples

TORONTO, ON / ACCESSWIRE / June 20, 2022 / Gratomic Inc. (“Gratomic”, “GRAT,” or the “Company”) (TSXV:GRAT)(OTCQX:CBULF)(FSE:CB82) announces the production of its first batch of samples expected to be representative of the commercial production from its Aukam plant in Namibia.

After receiving the bulk sample from the Company’s Aukam processing plant in Namibia, SGS performed a series of grinding and flotation stages with the material that replicated the Aukam flowsheet. Three different concentrate batches graded 97.8% C(t), 98.2% C(t), and 96.2% C(t). The combined concentrate grade of 97.4% C(t) meets the specifications of Gratomic’s tentative Technical Data Sheets (TDS) for a 97% product.

After sieving, the concentrate was separated into kg-sized sample lots, which will be forwarded to prospective end users, in order to start the product qualification process. Part of the material will be sent to specific development laboratories to proceed with testing and development of value-added processes such as micronization, spheronization, and purification to advance the integrated supply chain process for battery anode material.

 

All metallurgical testing and chemical characterization was completed by the independent laboratories at SGS Lakefield. SGS is one of the world’s leading testing, inspection and certification companies and provides a broad range of metallurgical process design and chemical characterization at the Lakefield, ON site.

“These results verify that our metallurgical process is adequate for producing the desired grades required by our end-users,” states Arno Brand President and CEO.

Armando Farhate COO & Head of Graphite Marketing and Sales says, “Having the cooperation with a world class organization, such as SGS Lakefield, bears very good fruits to the development of our flagship Aukam project.”

 

Gratomic wishes to emphasize that no Preliminary Economic Analysis, Preliminary Feasibility Study or Feasibility Study has been completed to support any level of production. In fact, no mineral resources let alone mineral reserves demonstrating economic viability and technical feasibility, have been delineated on the Aukam property.

The Company is working towards completing a Feasibility Study (FS) on the Aukam Processing plant. The study, its recommendations, and their subsequent implementation, will provide conclusions and recommendation at a FS level of comfort relating to the scale up of the existing processing plant to a commercial scale processing facility capable of producing the desired concentrate grades and production rates.

Gratomic wishes to emphasize that the supply of graphite is conditional on Gratomic being able to bring the Aukam project into a production phase, and for any graphite being produced to meet certain technical and mineralization requirements. Gratomic continues to move its business towards production and as part of its business plan, expects to file a National Instrument 43-101 Standards of Disclosure for Mineral Projects resource estimate in Q3 2022.


<< Previous
Bullboard Posts
Next >>