Val'dorI just looked up the distance between the mine and the mill, we are looking at a four hour drive, maybe more in a haul truck. I am sure this will add considerably to the milling cost. At 20 tons per load /120,000==6000 loads a year, first year--WOW--- up to 40 tons with an eighteen wheeler, still 3000 loads