Phase 1 Metallurgy
The Phase 1 Metallurgy report is produced on page 25 of the May 2024 Presentation.
With regard to the largest sample of the Keats Main it shows:-
83.6% of the gold in the sample is recovered by way of Gravity Extraction.
12.1% of the gold in the sample is recovered by way of CIL Extraction.
--------
95.7% overall gold extraction.
--------
Therefore, it seems that consideration may be given to the crushing and centrifuging ore on site and hauling the residue to a toll mill for extraction of the remaining 12.6% of gold.
Alternatively, after centrifuging the crushed ore, it could be stored at Queensway until a mill is commercially viable on site for underground mining.