RE:RE:RE:RE:RE:RE:RE:RE:RE:drillingDirk, solid info is hard to come by with these guys. Kawa cost $144 mil drilled to 21,500' and took what? 6 mos? Wei is to be drilled to 20,500' and cgx is carried for its share up to $130 mil (gross). Deducting this ain't a $75 mil 3 mo operation. Looks like they eliminated maybe 1 string. I'm sticking with a 5 mo operation minimum. And oh, anybody know if they plan a DST or if they plan to P&A at the end? I assume they will p&a but it would be nice if these chumps could communicate better. A real shame Suresh seems to pocket 20 large each month for what? All imo