RE:RE:Good news, bad newsWhat are you talking about? Based on the map, it appears la Guira was drilled at least at the limits of 2P structure for the Mirador. The Gachetta even further, as it s narrower. There is a very good chance that if they drill nearer the fault, net pay will increase, they may hit at both Une and Gachetta, and flow rates will improve significantly. With 3D coverage, they should soon, if not already, be very confident of where to drill La Guira 2. Recall LM2 was initially on the edge of the structure and had to be sidetracked. They would not betting back to the LM facilities and preparing LG2 without good reason.