RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:RE:Economic Viability of Kavango Project100 billion bbls estimated in the shale is the easy answer. Am guessing u know how this all got started with the ST1 well drilled in 1964 where they cored 620ft of immature Permian aged shale, and they hypothesized that the Basin deepen to the east, and then they came across the aeromagnetic survey which shows a deeper basin. So they are expecting, hypothesizing 6000ft thick stacked play similar to the Permian. And that's why everybody is jacked up on source rock. What's ur opinion on the core program? 4,000 -12,000ft, not sure what the water table is there but why not start coring after setting surface casing. Would be nice if they let us take a peek at the wireline log. Good luck to all