RE:Multilateral Horizontal in Saskatchewan and accelerates warrThe well is planned as a multi-lateral well to be drilled on a structural high, targeting Waseca sands and extending up to 700 m from the intermediate casing point. Sonoro is deploying Rig 184SS, a super single rig operated by Precision Drilling. The well is intended to reach targets within two weeks.