Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Pure Hydrogen Corporation Limited V.SXE


Primary Symbol: STRXF

Pure Hydrogen Corp Ltd is engaged in the hydrogen business. The company is focused on developing hydrogen and gas projects.


OTCPK:STRXF - Post by User

Post by kijijion Oct 22, 2020 9:34pm
107 Views
Post# 31769577

SITE PREPARATIONS COMMENCED FOR VENUS-1 CSG WELL

SITE PREPARATIONS COMMENCED FOR VENUS-1 CSG WELL
Strata-X Energy Ltd. and Real Energy, operator of Project Venus, located within the Surat basin, Walloon CSG fairway, has commenced site preparation and is mobilizing equipment for the drilling of the Venus-1 well. The Venus-1 well is expected to spud next week.
 
After reaching total depth, the plan is to case and suspend the well, and then demobilize the rig. Shortly afterward, a coil tubing rig will be mobilized and utilized to run a reservoir enhancement program. After the enhancement, the well will be set up as the first pilot production well for a controlled fluid drawdown, which testing will continue into early 2021. The production testing is designed to prove initial gas breakout and increasing gas flows over the controlled drawdown period. These data are required to model future gas flow rates and potentially commercial gas flow rates.
 
The results of the production test will also be used to decide to either expand the pilot or, if commercial flow rates are achieved, commence an aggressive appraisal program designed to certify sufficient reserves for the Project Venus JV to secure gas sales agreements, allowing for commercial field development.
 
About Project Venus
The 154-square-kilometre Project Venus (Strata-X 50 per cent and Real Energy 50 per cent) is located within the Walloon CSG fairway in the Surat basin. An independent expert has certified, on a best estimate basis, a prospective gas resources of 658 billion cubic feet (694 petajoules). Given the location of this tenement immediately adjacent to gas infrastructure and within a proven giant gas fairway, the Venus Project offers the potential to achieve early cash flows.
 
Real Energy and Strata-X Energy to merge
As announced on July 14, Strata-X Energy and Real Energy have agreed to merge and rename the merged company Pure Energy. Following the merger, Pure Energy will have 100 per cent of Project Venus.
<< Previous
Bullboard Posts
Next >>