RE:RE:Q3 report is out on sedaron a positive note
The Company is in an exciting phase right now with the build-out of our Sangdong Mine being in full swing towards completion of construction, with drawdowns on our KfW IPEX-Bank US$75.1 million loan facility being received on time and as planned and with the 7th and 8th drawdowns, totaling US$10.64 million, having been received during July 2024. In addition, given the fact that our underground Panasqueira mine, with a grade of 0.14%, is providing a significant positive EBITDA from mining operations, the Company expects very positive results from its underground Sangdong mine in South Korea, once it commences production, given its 0.46% grade of material to be mined.