Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.

Almonty Industries Inc ALMTF


Primary Symbol: T.AII

Almonty Industries Inc. is engaged in the mining, processing and shipping of tungsten concentrate from its Los Santos tungsten mine located near Salamanca, Spain, the processing and shipping of tungsten concentrate from its Panasqueira tin and tungsten mine in Covilha, Castelo Branco, Portugal, the evaluation of its Valtreixal tin and tungsten mine project located in Western Spain, as well as the evaluation and expected re-opening of its Sangdong tungsten mine project located in South Korea.


TSX:AII - Post by User

Comment by 5ilverlining808on Apr 18, 2024 2:53pm
113 Views
Post# 35996520

RE:RE:RE:Phase 1 to Phase 2 Development at Sangdong

RE:RE:RE:Phase 1 to Phase 2 Development at Sangdong
1dollarinto2 wrote: Thank you for sharing, your mining knowledge is always much appreciated. It is a good reminder that the mine doesn't require moving huge amounts of material.

I'm still unclear on what exactly needs to be done to move from phase 1 to phase 2 underground. When Lewis says they will start work on phase 2 underground in September, I don't understand what will be changing. Sounds like nothing is needed above ground with the mill.






Yes, nothing is needed above ground for the process plant.
I think phase 1 refers to the initital 600 metre strike zone at the top of the mine which is called the Hanging Wall (HW) and that is accessed from the first built top portal (Alfonse-D) well above the process plant level.
Phase 2 imo should be the Foot Wall (FW1, FW2 and FW3) accessed from the lower portal (Momty B) at process plant level that was the last to be buit.
All the underground ramps and galleries are now close to being built and connected, plus to ramp up there are no issues as the mine and process plant can still operate while develope for the latter stages are in operation.
The fact that the FW was split into 3 stages tells me they are not diving into shallow waters head first.
This stuff mostly came from the Almonty website under "projects" - "almonty Korea Tungsten" - scroll down to -"
Local Geology, Lithology".

<< Previous
Bullboard Posts
Next >>