TRILLION ENERGY’S GULUC-2 WELL TESTS 16.35 MMCF/DAY

On March 28, 5.5 metres of the lower natural gas sands in the Guluc-2 well were perforated and tested. Flow rates peaked at a rate of 16.35 MMcf/day. Shut-in pressure was measured at 2,000 psi. The well will now enter long-term production with an initial production rate of about 6 MMcf/d. As previously press released, the Guluc-2 well discovered 73 metres of gas pay across 14 separate intervals ...read more