Relocating 655 hyway ....Selby says ... “Basically, we have agreed plans with both the MTO (Ministry of Transportation) for the highway, as well as Hydro One for the power lines. There has been an agreed upon re-routing. The map for that is in the feasibility study. There are separate permits for each of those that need to be done. We’ll be going through that process between now and that mid-2025 construction date,” he said